Run the boning room pre-operational hygiene inspection
You are a Quality Assurance Officer on the day shift.
What is going on
For the first time you will run the boning room pre-operational hygiene inspection on your own, starting at 4 am on Thursday. The cleaning contractor signs off at 3:45 am. On Monday the underside of conveyor 3 and whizard station 6 failed and had to be re-cleaned, and the Quality Assurance Manager wants those areas checked closely and a swab taken. Every observation must be in the QA monitoring log before 5:15 am because the on-plant veterinary officer reviews the records at 7 am as part of daily verification. If any item fails on re-inspection you must call the Quality Assurance Manager before releasing the room. Boning starts at 5:30 am and a late start costs the plant a great deal.
Subject: Pre-op inspection of the boning room, Thursday 4 am
Tom is on the small stock floor on Thursday so you will run the boning room pre-operational inspection alone for the first time. Follow the Pre-operational Hygiene Inspection Procedure step by step and log every observation in the QA monitoring log before 5:15 am. The conveyor 3 underside failed on Monday, so pay attention there and take a swab. If anything fails on re-inspection, call me before releasing the room. The veterinary officer will review your records at 7 am.
Your brief
Conduct the pre-operational inspection following the procedure, record every observation, manage any failures through re-cleaning and re-inspection, take verification swabs and release the room or escalate correctly.
Work through it
You do not need to do it all. Doing a few of these will show you what the work is like. Your ticks and notes stay on this device.
What someone in this role would produce
- Equipment list and inspection sequence
- Completed QA monitoring log entries
- Swab plan and results record
- Non-Conformance Report for conveyor 3
- Release or escalation decision