Run a night possession on the 1,500 volt traction overhead
You are a Rail Traction Line Worker and possession lead in Rail Traction.
What is going on
A night possession on the Sunshine to Deer Park up line, work order WO-26-4377, runs from 0:30 am to 4:30 am on Saturday 13 September. The work is fourteen dropper replacements, a registration arm adjustment at structure 1226 and an inspection of the section insulator at structure 1231, in overhead wiring section 34. Traction switching schedule TS-26-0187 is validated and rail traction access RTA-26-0442 is requested. Track protection is provided by the rail operator. Last month a worker climbed a structure before the access was issued, recorded as INC-2026-046, and the Rail Traction Manager wants radio confirmation of the access to every crew member before anyone touches a structure. The down line remains live and trains may run on it.
Subject: Saturday night possession, Sunshine to Deer Park up line
The Saturday night possession on the Sunshine to Deer Park up line, work order WO-26-4377, runs from 0:30 am to 4:30 am with traction switching schedule TS-26-0187 and rail traction access RTA-26-0442. We are replacing fourteen droppers, adjusting the registration arm at 1226 and inspecting the section insulator at 1231. After the breach last month, I want the possession briefing to confirm by radio to every crew member that the access has been issued before anyone touches a structure. Plan the night, run the switching to schedule and hand back on time.
Your brief
Plan and run the possession: brief the crew with the new access confirmation rule, perform the traction switching to schedule, take the traction access, complete the maintenance and inspection safely with the live down line adjacent, test and verify the work, cancel the access and hand the section back on time with complete records.
Work through it
You do not need to do it all. Doing a few of these will show you what the work is like. Your ticks and notes stay on this device.
What someone in this role would produce
- Possession briefing and job risk assessment
- Completed access form and access register entry with radio confirmation noted
- Switching program register execution record for TS-26-0187
- Work order with measurements and completion
- Asset inspection register entry for the section insulator