Complete a pole inspection route in a bushfire risk area

You are an Asset Inspector working under the Overhead Distribution Manager's vicinity authority.

Simulated workplaceEntry missionCAQA Gridworks Networks

What is going on

The Creswick feeder CRK-04 inspection route, work order WO-26-4360, has 72 poles remaining and must be complete before the fire danger period. You are working under vicinity authority VA-26-0871 held by the Overhead Distribution Manager, with Riley Chen assisting. Three priority one defects have already been found on the route, including a condemned pole at 119. The route runs along the Creswick to Clunes Road with roadside poles, a section through paddocks with a pole surrounded by long grass, and one pole with a wasp nest reported by the previous inspector. The client requires every pole recorded in the register, with residual strength calculated for every wood pole tested.

Warwick Ngata, Overhead Distribution Manager
Subject: Finish the CRK-04 inspection route and report the condemned poles

You have 72 poles left on the Creswick feeder CRK-04 inspection route under work order WO-26-4360 and vicinity authority VA-26-0871. The fire danger period is coming and the client wants this feeder complete by 19 September. Inspect and test each pole to the pole inspection procedure, record every pole in the asset inspection register whether or not you find a defect, phone the controller for any priority one, and tag condemned poles. Riley will work with you under my authority. I want the register up to date every evening.

Your brief

Inspect and test the allocated poles to the pole inspection procedure, working safely near live apparatus and on the roadside, record every pole in the asset inspection register with findings, residual strength and defect priority, report any priority one defect to the network controller before leaving the site, and tag and raise work orders for condemned poles.

Work through it

You do not need to do it all. Doing a few of these will show you what the work is like. Your ticks and notes stay on this device.

What someone in this role would produce

  • Completed tailgate briefing and job risk assessment
  • Asset inspection register entries for every pole inspected
  • Record of any priority one report to the controller
  • Updated work order with progress and hours

Printing this is a record of what you explored. It is not a certificate or a qualification.