Carry out dam safety surveillance and prepare the monthly report
You are the Hydro Operator at the Mitta Ranges station.
What is going on
Gallery drain D-14 at the Mitta Ranges concrete gravity dam has increased from 0.4 to 0.9 litres per minute over two months. The reading is below the alert level but the trend concerns the dam safety engineer, who wants a full instrument reading set and a written report this month. The storage is at 71 percent after winter rain and the hydro unit is out of service for governor work under OUT-26-09, so environmental flow is being released through the bypass valve. The weekly walkover, the piezometers, the seepage weirs and the survey points are all due. Two people must attend the gallery and the downstream toe.
Subject: Dam gallery drain D-14 trend and the monthly report
Drain D-14 in the dam gallery has doubled its flow over two months. It is still under the alert level but the dam safety engineer wants a full instrument reading set and a written report this month rather than next. Please complete the weekly walkover and all the piezometer and weir readings to the surveillance procedure, enter them in the Operations Log, update the hazard in the incident register and prepare the monthly report for my review by 18 September.
Your brief
Complete the walkover inspection and the full instrument reading set to the dam safety surveillance procedure, record everything in the Operations Log, update the hazard in the incident register, raise or update the work order for D-14 and prepare the monthly surveillance report for the Renewables Manager.
Work through it
You do not need to do it all. Doing a few of these will show you what the work is like. Your ticks and notes stay on this device.
What someone in this role would produce
- Inspection checklist and reading schedule
- Operations Log entries
- Updated incident register and work order records
- Monthly surveillance report
Printing this is a record of what you explored. It is not a certificate or a qualification.