Verify tests and prepare the certificate for a new three phase supply
You are a licensed electrician in Electrical Contracting.
What is going on
Job J-26-1147 at Fairmont Engineering Works in Geelong installed a new 63 A three phase supply and isolator for a CNC machine. The Leading Hand completed the tests on Friday and the compliance register shows the results as Tests recorded. The General Manager checks every prescribed work certificate before it is lodged and has asked for a review of the test sheet against the policy and procedure before he signs. The customer wants the machine running on Wednesday. The test sheet shows earth continuity, insulation resistance, polarity and fault loop impedance, but the residual current device test line is blank and the instrument identification is written as 'van tester'.
Subject: Fairmont CNC supply: tests and certificate before I sign
Ryan has finished the three phase supply for the CNC machine at Fairmont, job J-26-1147, and the tests were done on Friday. Before I check and sign the certificate I want you to go through the test sheet against the testing and certification policy and the procedure, confirm every mandatory test was done and the values are within the standard, check the instrument used was in calibration, and enter the results properly in the compliance register. If anything is missing, go back to site with Ryan and complete it. The customer wants the machine running Wednesday.
Your brief
Review the test results against the testing and certification policy and the installation testing procedure, identify what is missing or inadequate, arrange and record the outstanding tests, confirm the instrument and its calibration, complete the compliance register entry properly and prepare the certificate of electrical safety for the General Manager's check.
Work through it
You do not need to do it all. Doing a few of these will show you what the work is like. Your ticks and notes stay on this device.
What someone in this role would produce
- Completed test results and commissioning sheet with all mandatory tests and the instrument recorded
- Updated compliance register entry
- Draft certificate of electrical safety for checking
- Note to the General Manager on the review findings
Printing this is a record of what you explored. It is not a certificate or a qualification.