You are an accredited solar designer and installer in the Solar and Battery team.

Simulated workplaceAdvanced missionCAQA Voltline Electrical

What is going on

Kingsley Grammar School wants a 99 kW rooftop photovoltaic system and a 100 kWh battery on its sports centre, job J-26-1171, and needs generation and savings figures for its board meeting on 20 October. The sports centre has a north-facing metal deck roof with a row of skylights, a tree line on the eastern boundary, and a main switchboard rated at 400 A per phase that already supplies the pool plant and the air conditioning. The school has interval metering data for the past year. Network rules limit export for systems of this size and require an export control device. The battery must go in a plant room that also houses the pool chemical dosing equipment.

Sam Whitworth, Solar and Battery Manager
Subject: Kingsley Grammar sports centre survey on Wednesday

The Kingsley Grammar site survey for the 99 kW solar and 100 kWh battery, job J-26-1171, is on Wednesday morning. The sports centre roof is metal deck with skylights, so plan the roof access and fall protection before you go up. I want a complete survey: roof, shading, switchboard capacity, existing supply and metering, network constraints and a battery location that meets the standard's clearances. Bring me a preliminary design with a generation estimate and a draft quotation for the school's October board meeting.

Your brief

Plan and complete a safe site survey, gather the information the design needs, produce a preliminary design and generation estimate that meets the standards and the network's connection rules, identify a compliant battery location, and prepare a draft quotation for the Solar and Battery Manager's review.

Work through it

You do not need to do it all. Doing a few of these will show you what the work is like. Your ticks and notes stay on this device.

What someone in this role would produce

  • Completed job safety analysis for the roof survey
  • Site survey record with measurements, shading and switchboard findings
  • Preliminary design with array layout, string design, inverter and battery selection and generation estimate
  • Draft quotation on the template
  • One page board summary