Run the night crushing shift and build the road base stockpile
You are the control room operator on the Wattle Creek night crushing shift.
What is going on
From 14 September 2026 the Wattle Creek plant runs a night crushing shift to fill a Hunter Roads Consortium order for 20 millimetre aggregate and road base. Conveyor CV03 has returned to service after its guard was refitted. The road base stockpile must be built and blended to specification, samples must be taken at the intervals on the quality plan, and the crusher must stay within its limits. The environmental authority restricts night noise and dust, and the crusher sprays and the stockpile shaping are part of the trigger action response plan. Any plant alarm, guard problem or dust exceedance must be recorded and reported to the Processing Superintendent.
Subject: Night crushing shift, control room and stockpiles
You are on the night crushing shift in the Wattle Creek control room from Monday. The plant has to produce 20 millimetre aggregate and road base to specification for the Hunter Roads Consortium order, and the road base stockpile needs to be built and blended without running the crusher outside its limits. Read the Environmental Policy dust section and the plant work instructions, take the samples at the intervals on the quality plan, log the stockpile tonnages, and record any plant alarm or guard issue in the Hazard and Incident Register. CV03 is back in service, so include it in your start-up checks.
Your brief
Carry out the control room start-up checks, run the crushing and screening plant within its limits, build and blend the road base stockpile, take and record the quality samples, and record any plant, guarding or environmental issue in the Hazard and Incident Register.
Work through it
You do not need to do it all. Doing a few of these will show you what the work is like. Your ticks and notes stay on this device.
What someone in this role would produce
- Start-up check record
- Sample results and stockpile blending record
- Hazard and Incident Register entries for the alarm and dust event
- Shift report for the Processing Superintendent
Printing this is a record of what you explored. It is not a certificate or a qualification.
