You are the panel operator for the solvent recovery unit on day shift, Panel C.

Simulated workplaceIntermediate missionCAQA Hydra Chemical and Refining

What is going on

The solvent recovery column has been shut down and under nitrogen since the reflux pump seal failure on 2 September. Permit PW-26-0781 is closed, but the blind list still shows two blinds fitted on the reflux line and the pre-start-up checklist has not been started. The emergency shutdown system was function tested in July. Cooling water is available but the steam header is at the low end of its normal pressure because the boiler is on one burner. Wayne Djakovic will authorise each stage and Tahlia Brennan is the outside operator. The laboratory can turn around an overhead sample in 40 minutes. Bruce Kalinowski expects the column on specification by the end of the shift with every step in the shift log.

Bruce Kalinowski, Production Superintendent
Subject: Start the solvent recovery column after the pump repair

Permit PW-26-0781 on the reflux pump is closed and the column has been under nitrogen since Wednesday. I want you to bring the column back on line on day shift with Wayne authorising each stage. Follow the start-up procedure exactly: pre-start-up checks, blind reconciliation, inerting and leak test, feed and steam ramp, then product to specification. Record every step in the shift log. If anything is outside the safe operating limits sheet, hold and call Wayne. We do not need another excursion.

Your brief

Bring the column on line safely under the start-up procedure: complete the pre-start-up checks and blind reconciliation, inert and leak test, establish feed and heat to the ramp table, bring product to specification and record every stage, holding and escalating if any variable approaches a safe operating limit.

Work through it

You do not need to do it all. Doing a few of these will show you what the work is like. Your ticks and notes stay on this device.

What someone in this role would produce

  • Signed pre-start-up checklist with blind reconciliation
  • Inerting and leak test record
  • Shift log entries for every stage of the start-up
  • Shift handover report