Debottleneck the solvent recovery column through management of change
You are a process engineer in Technical Services and Environment.
What is going on
The solvent recovery column is limited to about 85 percent of nameplate feed rate because the reboiler reaches its steam duty limit before the column floods. Customers are being turned away and used solvent is stockpiling in T-310. MOC-26-034 proposes a feed preheater using low pressure steam and a bypass tie-in on the feed line, which will require a hot work permit for the tie-in. The change affects the column heat balance, the relief case, the safe operating limits and the emergency shutdown logic. The reflux pump trip and the six minute limit excursion on 2 September are still under investigation. Ingrid Solberg wants the performance analysis and the complete management of change request, with the hazard assessment and the pre-implementation actions, before the permit for the tie-in can be issued.
Subject: Debottleneck the solvent recovery column through MOC-26-034
The solvent recovery column is limited by reboiler duty and we are turning away feed. MOC-26-034 proposes a feed preheater and a bypass tie-in. I want you to analyse the column performance data, confirm where the bottleneck sits, complete the management of change request including the hazard assessment and the effect on the safety case control measures, and set out the pre-implementation actions. The hot work permit for the tie-in cannot be issued until the change is approved, so the review needs to be thorough rather than fast.
Your brief
Analyse the column performance data to confirm the bottleneck, evaluate the preheater and bypass option against alternatives, complete the management of change request with a hazard assessment and an assessment of the effect on safety case control measures and safe operating limits, and define the pre-implementation actions and the pre-start-up safety review.
Work through it
You do not need to do it all. Doing a few of these will show you what the work is like. Your ticks and notes stay on this device.
What someone in this role would produce
- Column performance analysis with bottleneck confirmed
- Heat balance and capacity estimate with assumptions
- Alternatives evaluation
- Completed management of change request with hazard assessment
- Pre-implementation action list and register update
Printing this is a record of what you explored. It is not a certificate or a qualification.