Conduct a detailed energy audit of the sort building
You are an operational excellence analyst working with the advisory team.
What is going on
The Eastern Creek sort building uses about 60 percent of the site's electricity through conveyors, optical sorters, balers, compressors and high bay lighting. Two projects are proposed: variable speed drives on the main conveyors and rooftop solar. Fiona Ashcroft wants a detailed energy audit under the procedure before committing capital. Harpreet Gill has twelve months of interval data, the equipment register with motor ratings and operating hours, and the electricity invoices. Sub-metering exists on the compressors only. The building runs two shifts, six days, and the out of hours base load has never been measured. The management review on 22 September wants the ranked opportunities and a business case for the drives project.
Subject: Energy audit of the sort building
Fiona has approved a detailed energy audit of the Eastern Creek sort building before we commit to the variable speed drive and solar projects. Harpreet has the twelve months of interval data and the equipment register. I would like you to run the audit under the energy audit procedure: build the energy balance, walk the building during and after operations to find the base load, quantify the top opportunities and put the numbers into the business case template for the drives project. The management review wants it on 22 September.
Your brief
Conduct the audit to the detailed level: assemble and check the data, walk the building during operation and after hours, build an energy balance that reconciles to the invoices, quantify and rank the opportunities with emissions avoided, and complete the business case template for the variable speed drive project.
Work through it
You do not need to do it all. Doing a few of these will show you what the work is like. Your ticks and notes stay on this device.
What someone in this role would produce
- Audit plan and audit workbook with sources
- Energy balance reconciled to invoices
- Ranked opportunity list with emissions avoided
- Completed business case for the variable speed drive project
- Audit report for management review
Printing this is a record of what you explored. It is not a certificate or a qualification.