Brands, services, platforms and people
Try It by Career Calling

Coordinate the Sandringham bar front installation

You are the assistant to the Installation Coordinator.

Simulated workplaceAdvanced missionCAQA Craftline Furnishing

What is going on

Bayside Hospitality Group has ordered a curved oak veneer bar front with brass inlay for its Sandringham venue (JO-26-1047), installing from 14 October on a builder's site with a mezzanine. The builder locks the program on 2 October and needs Craftline's safe work method statement, crew induction records and delivery plan before then. The bar front is being built in the cabinet factory in three sections and needs the large truck and a crane or lift for the mezzanine. Jarrah Thompson has asked you to own the coordination and the installation schedule entry, and to flag anything that could slip the date, including the CNC service on 12 and 13 October.

Jarrah Thompson, Installation Coordinator
Subject: Coordinate the Sandringham bar front installation

The Bayside Hospitality Group bar front (JO-26-1047) installs from 14 October and the builder locks the program on 2 October. I need you to confirm site access, lift and power with the builder, prepare the safe work method statement for the mezzanine work, book Crew 1 and the large truck, and make sure every crew member has done the builder's site induction. Put the plan in the installation schedule and flag anything that could slip the date.

Your brief

Confirm site access, lifting, power and program with the builder, prepare a safe work method statement for the mezzanine work using the job safety analysis template, book the crew and truck, verify inductions, and enter a complete plan in the installation schedule with risks flagged for the coordinator.

Work through it

You do not need to do it all. Doing a few of these will show you what the work is like. Your ticks and notes stay on this device.

What someone in this role would produce

  • Site requirements record in the job order
  • Safe work method statement
  • Installation schedule entries for the three days
  • Crew induction status list
  • Coordination plan with risks

Printing this is a record of what you explored. It is not a certificate or a qualification.