Check and release kiln charge KC-26-118

You are the kiln operator on day shift at the Heyfield sawmill.

Simulated workplaceIntermediate missionCAQA Timberline Forest and Wood Products

What is going on

Kiln charge KC-26-118, 96 cubic metres of 90 x 45 radiata pine framing, has run the standard schedule in kiln 4 and reaches the end of the conditioning stage on Thursday morning. The Kiln and Dry Mill Coordinator is off site at the heat plant service. Bassline Frame and Truss is waiting on MGP12 from this charge for order SO-26-2218 and the despatch team has already asked twice when it will be ready. Kiln 2 was taken out of service on Tuesday after its door seal split, and the coordinator wants the kiln 4 seal checked for the same fault. The controller log shows one wet bulb alarm on Wednesday night that the night operator acknowledged but did not describe.

Elise Vandenberg, Kiln and Dry Mill Coordinator
Subject: Kiln 4 charge KC-26-118 finishing Thursday

Charge KC-26-118 is in kiln 4 on the 90 x 45 schedule and is due to finish Thursday morning. I am off site at the heat plant service on Thursday, so you will check the charge, take the sample board and random moisture readings and decide whether to release it. Bassline is waiting on the MGP12 from this charge, but do not release it on despatch pressure. Read the Timber Kiln Drying Operation Procedure first, log the readings in the register and raise a work order if the door seal on kiln 4 looks like the one that split on kiln 2.

Your brief

Complete the end of charge checks for KC-26-118, decide whether the charge is released or held, record the readings and decision in the register, raise any maintenance work order, and report to the Kiln and Dry Mill Coordinator and the Sawmill Manager.

Work through it

You do not need to do it all. Doing a few of these will show you what the work is like. Your ticks and notes stay on this device.

What someone in this role would produce

  • Moisture reading sheet with sample and random board results
  • Updated Log Yard and Stock Register line for KC-26-118 with the release decision
  • Maintenance work order if raised
  • Shift report to the coordinator and Sawmill Manager