Brands, services, platforms and people
Try It by Career Calling

Set out the ground floor wall frames for units 1 to 3

You are a third year apprentice carpenter on the framing crew.

Simulated workplaceIntermediate missionCAQA Keystone Construction and Plumbing

What is going on

The basement slab and ground floor slab for units 1 to 6 at Kellerman Street have cured and the surveyor has placed the control points and the building line. The Construction Manager needs the ground floor wall frames for units 1 to 3 set out and checked before the framing crew arrives on Monday. The architectural drawings show party walls on the boundary between units, wet areas with set-downs and a stair void in each unit. The frame supplier's layout gives the frame lengths and openings. Rain is forecast for the afternoon and the site diary must record the set-out check. Any dimension that does not close has to be reported to the leading hand before frames are stood.

Fiona Okafor, Construction Manager
Subject: Set-out for units 1 to 3 wall frames starts Monday

The Kellerman Street slab for units 1 to 6 is cured and the surveyor's control points are in. I need the set-out for the ground floor wall frames of units 1 to 3 checked and marked before the framing crew arrives on Monday. Work from the architectural drawings A-101 and A-102 and the frame layout from the truss supplier. Record the set-out check in the site diary and let Jack know if any dimensions do not close. The dogging licence I hold has lapsed, so do not plan any lifts that rely on me.

Your brief

Read the plans and the frame layout, calculate and mark the set-out for the ground floor wall frames of units 1 to 3, check the set-out for square and dimension closure, and record the check so the frames can be stood on Monday.

Work through it

You do not need to do it all. Doing a few of these will show you what the work is like. Your ticks and notes stay on this device.

What someone in this role would produce

  • Set-out sketch with calculations and diagonals
  • Site diary entry recording the set-out check
  • List of discrepancies and who they were reported to
  • Photographs of the marked set-out

Printing this is a record of what you explored. It is not a certificate or a qualification.