Estimate the covered play deck extension
You are the Estimator in the Estimating and Contracts team.
What is going on
Bayview Early Learning Group has asked Keystone to price a covered outdoor play deck and pergola at the rear of its Berwick centre. The drawings show a 48 square metre timber deck on stumps, a steel and timber pergola with a polycarbonate roof, balustrade, a drinking fountain and two external power points. The specification calls for a slip-resistant decking board and a balustrade that complies with the National Construction Code for childcare premises. The Estimating and Contracts Manager wants the estimate ready for review by 11 September and has asked that anything on the drawings that would not comply be flagged rather than priced silently. Subcontractor quotes are needed for the electrician and the plumber.
Subject: Estimate request: deck and pergola extension, Berwick
Bayview Early Learning has asked for a price to add a covered outdoor play deck and pergola to the rear of the Berwick centre. The drawings and the specification are in the project folder. I need a full take-off, a labour and material schedule and a priced estimate ready for my review by 11 September. Include the subcontractor allowance for the electrician and the plumber for the drinking fountain, and flag anything on the drawings that does not comply with the National Construction Code for childcare centres.
Your brief
Produce a quantity take-off from the drawings, a labour and material schedule, subcontractor allowances and a priced estimate with margin, and a short list of compliance issues found on the drawings, ready for the manager's review.
Work through it
You do not need to do it all. Doing a few of these will show you what the work is like. Your ticks and notes stay on this device.
What someone in this role would produce
- Quantity take-off sheet
- Labour and material schedule
- Priced estimate summary with assumptions and exclusions