Other Building Completion and Related Trades Workers

This unit group covers Building Completion and Related Trades Workers not elsewhere classified. It includes Shopfitters, Swimming Pool and Spa Builders, and Waterproofers.

Technicians and Trades Workers
Simulation

A cafe fit-out with two days to go

You are a shopfitter on a small crew, in a cafe that is meant to open on Friday morning with a customer who is not sleeping well. It is Wednesday at 7am. The cabinets are in, but the electrician is behind, the painters want to start, and the owner has asked for an extra display shelf that was never in the plans.

Choose what you would do. Then see what happens. There are often good reasons for each choice.

Mei, the cafe owner

Good morning! I have had a brainwave. Could we add a long display shelf for pastries along the front window? I think it would look amazing. I know it is a late change, but you are so clever.

Say yes straight away, because the owner is excited and it is only a shelf
This could go wrong

The shelf takes a day and a half, and the painters are held up. On Friday morning the wall behind the shelf is still wet and the cafe opens with a notice taped to it.

Sketch it with her, say what it would cost in time and what would wait, and let her pick
Could work, with a catch

Mei decides to add the shelf next week and open on time. The decision is hers and sensible, but you spent an hour of a tight morning drawing it for her.

Show her the effect on the opening date, and offer a plan after opening
A strong call

Mei laughs and agrees to wait. You book the shelf in for the Monday after opening, and she tells her friends the shelf is coming. The opening date is safe.

Kofi, the electrician

I am running behind. If you fix the lower cabinets to the wall now, I will have to cut into them later to run the cables. If you wait, you lose the morning. Your call, but tell me which one.

Fix the lower cabinets now and let Kofi cut into them later, to save the morning
This could go wrong

Kofi cuts into finished cabinets, a hole is a bit too big, and the cleaned surface is damaged. Patching it costs a half-day and the cabinet looks repaired, not new.

Ask Kofi where the cables go, mark it on the wall, and fit around them
A strong call

Kofi marks it in ten minutes. You fix the cabinets with holes ready in the right places, and both trades finish the morning with nothing to redo.

Wait for Kofi to finish before you do anything at all in the room
Could work, with a catch

It avoids a clash, but the whole morning is lost and the cabinets are no closer to being done. Waiting felt polite and it cost the opening.

Tane, the apprentice

I have found a scratch along the new counter edge, about as long as my hand. I think it happened when the painters moved the ladder. Should I mention it, or can we polish it out and hope?

Check it carefully, tell the head painter, and repair it so it does not show
Could work, with a catch

The repair is clean, but you did not make clear who is responsible. The painters feel blamed and the next day the two crews are not talking.

Polish it out and say nothing, since the scratch is fixed and no one needs to know
This could go wrong

The scratch is gone, but the cause is not. The same ladder scratches another counter edge on Thursday, and this time the owner notices it herself.

Fix the scratch, then ask the painters to cover the edges while they work
A strong call

The painters nod and tape up the edges. No more scratches appear, and Tane learns that fixing a problem includes stopping it happening again.

How it went

On Friday morning the cafe opens on time, the shelf is booked for Monday and the room smells of coffee and fresh paint. Shopfitting is about fitting many people's work into one tight schedule. Would you enjoy the pressure of making a deadline you cannot move?

This is a simplified, fictional situation to help you explore. It is not professional instruction or a test of your ability.

Case study: The counter that did not fit the lift

A fictional case set in a shopfitting crew that builds counters, display cabinets and fit-outs for new shops, cafes and clinics.

The situation

A shopfitting team led by Ngozi built a long curved counter for a new bakery in a shopping arcade. It was made in the workshop in one piece to save time. On delivery day, the team found that the arcade's goods lift was a hand's width too narrow for the counter, and the stairs had a tight turn. The bakery owner, Tomasz, was opening in two days and had already been advertising the date on the footpath outside.

What they did

Ngozi did not try to force it. She measured every route into the shop and found there was none that fit. She rang the workshop and asked the team to cut the counter into two sections along a seam that could be hidden under the benchtop. Overnight, the team joined them on site, filled the join and finished the surface. She told Tomasz exactly what had happened and what the plan was, before he asked.

How it turned out

The counter was in place by midday on opening eve. The join was invisible unless you knew where to look. Ngozi's team now measures access routes before they build anything over a certain size, and writes it on the job sheet.

What would you do?

  • Why do you think the team built it in one piece, and what would you have done differently?
  • How would you stay calm with a deadline two days away?
  • What do you think it feels like to see your work on the first day of a new business?